Sartorius YDP 03-0CE Instrukcje Operacyjne Strona 6

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 5
6
Installation
Equipment Supplied
The following components are supplied:
Interface cable for connecting the printer
to a weighing instrument
Black ink ribbon cassette (is installed)
4 rechargeable batteries
Paper roll
Installing the Rechargeable Batteries
§ Remove the 4 batteries from the packaging
(they are discharged)
§ Lift the cover of the paper roll compartment
§ To open the battery compartment, tilt back the cover
§ Install the 4 rechargeable batteries in the battery compart-
ment. Make sure that the poles match the + and – signs!
§ To close the battery compartment, press down on the
cover
§ To close the paper roll compartment, lower the cover
You cannot thread the paper roll until the printer has been
turned on.
Przeglądanie stron 5
1 2 3 4 5 6 7 8 9 10 11 ... 116 117

Komentarze do niniejszej Instrukcji

Brak uwag